Thursday 9th May

The hydrazine tank was moved into position on the scales, so the amount of fuel loaded could be accurately measured, and the final arrangements were made.

Fuelling activities begin. The final walk through was done and the fuelling team were allowed to connect to the Hydrazine tank.

Tomorrow the spacecraft is filled!

In the evening the team were treated to the launch of Starlink Group 8-2